- Formulate strategies, detailing and specifications for landscapes
ST0742 Formulate strategies, detailing and specifications for landscapes
- Gather FM-related information for continuous improvement purposes
ST0617 Gather FM-related information for continuous improvement purposes
- Identify and confirm carpentry or joinery requirements and components against specification/drawings/CAD/BIM and in accordance with Building Regulations
ST0264 Identify and confirm carpentry or joinery requirements and components against specification/drawings/CAD/BIM and in accordance with Building Regulations
- Identify and confirm fenestration installation requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations such as Approved Documents Parts A-J, K-N, P, Q and Regulation 7
ST0743 Identify and confirm fenestration installation requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations such as Approved Documents Parts A-J, K-N, P, Q and Regulation 7
- Identify and confirm installation requirements for pre-assembled (e.g. Columns or beams) and manufactured elements and components (e.g. cut or bent reinforcement bars) against specification/drawings/construction information.
ST0271 Identify and confirm installation requirements for pre-assembled (e.g. Columns or beams) and manufactured elements and components (e.g. cut or bent reinforcement bars) against specification/drawings/construction information.
- Identify and confirm masonry requirements against surveys, job sheets, specifications and drawings/CAD, and in accordance with Building Regulations.
ST0442 Identify and confirm masonry requirements against surveys, job sheets, specifications and drawings/CAD, and in accordance with Building Regulations.
- Identify and confirm plastering requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations.
ST0096 Identify and confirm plastering requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations.
- Identify and inspect Fall protection equipment for own use and commissioning purposes
ST0614 Identify and inspect Fall protection equipment for own use and commissioning purposes
- Identify and respond to customer needs
ST0295 Identify and respond to customer needs
- Identify and select appropriate plastering materials, modern pre-blended and loose plasters, renders and additives including compounds, fixings, performance plasterboards, reinforcements and beads to carry out the plastering work in line with specifications and manufactures instructions.
ST0096 Identify and select appropriate plastering materials, modern pre-blended and loose plasters, renders and additives including compounds, fixings, performance plasterboards, reinforcements and beads to carry out the plastering work in line with specifications and manufactures instructions.
- Identify and use the appropriate calibrated digital testing equipment for copper or fibre products
ST0832 Identify and use the appropriate calibrated digital testing equipment for copper or fibre products
- Identify different types of building construction and terminology
ST0670 Identify different types of building construction and terminology
- Identify different types of building construction and terminology, including timber roof construction, pitched roof coverings, foundation types, load bearing wall construction, timber frame constructed buildings, etc.
ST0670 Identify different types of building construction and terminology, including timber roof construction, pitched roof coverings, foundation types, load bearing wall construction, timber frame constructed buildings, etc.
- Identify faults and ensure plant is maintained to the correct standard, ensuring all procedures have been met when plant is prepared for road travel
ST0414 Identify faults and ensure plant is maintained to the correct standard, ensuring all procedures have been met when plant is prepared for road travel
- Identify requirements, develop the work programme and schedule, plan their own work and that of the team accordingly, ensuring this is communicated clearly to colleagues.
ST0263 Identify requirements, develop the work programme and schedule, plan their own work and that of the team accordingly, ensuring this is communicated clearly to colleagues.
- Identify, deal with and report issues and problems
ST0669 Identify, deal with and report issues and problems
- Identifying mould growth associated with condensation.
ST0670 Identifying mould growth associated with condensation.
- Implement administrative procedures for the running of a construction project
ST0331 Implement administrative procedures for the running of a construction project
- Implement necessary pedestrian controls and traffic management.
ST0651 Implement necessary pedestrian controls and traffic management.
- Inspect the site for relevant access and power to allow the installation to start
ST0802 Inspect the site for relevant access and power to allow the installation to start
- Define entities for link analysis (Entity)
select the types of instances: competence profile or defintion
- Define the instance to link from (From)
select an instance (profile or definition) in the knowledge base or create a description to connect from
- Define the scope of instances to link to (To)
select the dimension to consider and the range of relevance in link analysis
- Connect and view (Connect)
view the connected in the ranges of relevance