• Home
  • Definition
  • Browse competence definitions
  • Search definitions by domain, dimension or keywords and view their places in the generalisation hierarchy.
  1. Complete quality assurance checks in accordance with specification to enable handover in line with site procedures
    ST0388 Complete quality assurance checks in accordance with specification to enable handover in line with site procedures
  2. Complete work in respect of fire doors in accordance with current legislation.
    ST0263 Complete work in respect of fire doors in accordance with current legislation.
  3. Compliance with Working at Heights regulations, outdoor working and suitability of weather conditions
    ST0821 Compliance with Working at Heights regulations, outdoor working and suitability of weather conditions
  4. Comply with all relevant legislation and initiate and maintain the necessary paperwork
    ST0414 Comply with all relevant legislation and initiate and maintain the necessary paperwork
  5. Comply with commercial, contractual, environmental obligations and consumer awareness
    ST0802 Comply with commercial, contractual, environmental obligations and consumer awareness
  6. Comply with environmental policies and practice sustainable principles, supporting the civil engineering projects they work on to assist in the achievement of United Nations Sustainable Development Goals and net-zero carbon emissions
    ST0091 Comply with environmental policies and practice sustainable principles, supporting the civil engineering projects they work on to assist in the achievement of United Nations Sustainable Development Goals and net-zero carbon emissions
  7. Comply with relevant legislation, regulations, policies, strategies, and technical guidance, such as such as Construction Design and Management (CDM) or Design Manual for Roads and Bridges (DMRB), ensuring they are interpreted correctly and communicated appropriately
    ST0091 Comply with relevant legislation, regulations, policies, strategies, and technical guidance, such as such as Construction Design and Management (CDM) or Design Manual for Roads and Bridges (DMRB), ensuring they are interpreted correctly and communicated appropriately
  8. Comply with the current legislation, work instructions and toolbox talks to carry out the work and maintain safe and healthy work practices
    ST0265 Comply with the current legislation, work instructions and toolbox talks to carry out the work and maintain safe and healthy work practices
  9. Conduct desk-based research in preparation for an infrastructure project in order to determine those with a legal interest in affected land, to establish an accurate representation of the land ownership within the area of interest.
    ST0877 Conduct desk-based research in preparation for an infrastructure project in order to determine those with a legal interest in affected land, to establish an accurate representation of the land ownership within the area of interest.
  10. Conduct interim and final inspections of the work and work area
    ST0743 Conduct interim and final inspections of the work and work area
  11. Conduct interim and final inspections of the work and work area.
    ST0096 Conduct interim and final inspections of the work and work area.
  12. Conduct interim and final inspections of the workmanship, ensuring drainage and ventilation is clear and functioning and the work is correct to specification and systems manuals
    ST0802 Conduct interim and final inspections of the workmanship, ensuring drainage and ventilation is clear and functioning and the work is correct to specification and systems manuals
  13. Conduct interim inspection of plumb line and level in accordance with specifications and systems manuals and carry out any corrective work required
    ST0802 Conduct interim inspection of plumb line and level in accordance with specifications and systems manuals and carry out any corrective work required
  14. Conduct reasonable enquiries via phone, email and/or in person to confirm land ownership and occupational interests with individuals and companies believed to have an interest in the land.
    ST0877 Conduct reasonable enquiries via phone, email and/or in person to confirm land ownership and occupational interests with individuals and companies believed to have an interest in the land.
  15. Conduct site visits to negotiate with landowners to secure land access and to post/remove site notices.
    ST0877 Conduct site visits to negotiate with landowners to secure land access and to post/remove site notices.
  16. Conserve or restore existing stonemasonry, brickwork or earthen structures on Heritage Structures using appropriate heritage techniques and following conservation ethics and procedures.
    ST0442 Conserve or restore existing stonemasonry, brickwork or earthen structures on Heritage Structures using appropriate heritage techniques and following conservation ethics and procedures.
  17. Conserve or restore stonemasonry, brickwork or earthen structures.
    ST0442 Conserve or restore stonemasonry, brickwork or earthen structures.
  18. Construct positive or negative running moulds according to specifications and drawings.
    ST0096 Construct positive or negative running moulds according to specifications and drawings.
  19. Construction Industry and Building Methods
    ST0295 Construction Industry and Building Methods
  20. Contribute to civil engineering solutions by preparing, producing and modifying engineering diagrams, drawings or models, documents and engineering specifications, to industry codes of practice, regulations, standards, and procedures
    ST0091 Contribute to civil engineering solutions by preparing, producing and modifying engineering diagrams, drawings or models, documents and engineering specifications, to industry codes of practice, regulations, standards, and procedures
  21. Contribute to planning applications and other regulatory procedures
    ST0741 Contribute to planning applications and other regulatory procedures
  22. Contribute to production and review of technical fire safety reports following appropriate methodologies
    ST0859 Contribute to production and review of technical fire safety reports following appropriate methodologies
  23. Contribute to the development, assessment and quantification of acceptable alternative solutions where proprietary solutions will not work due to bespoke/unique nature of the built environment
    ST0859 Contribute to the development, assessment and quantification of acceptable alternative solutions where proprietary solutions will not work due to bespoke/unique nature of the built environment
  24. Contribute to the planning and assessing of appropriate design solutions and contribute to their refinement, evaluation and quality improvement
    ST0859 Contribute to the planning and assessing of appropriate design solutions and contribute to their refinement, evaluation and quality improvement
  25. Contributing to the installation of the UK's super-fast fibre Telecoms network including cable installation, recovery of older products, jointing and splicing new cables, installing new access connection points or cabinets and the installation of overhead fibre services.
    ST0832 Contributing to the installation of the UK's super-fast fibre Telecoms network including cable installation, recovery of older products, jointing and splicing new cables, installing new access connection points or cabinets and the installation of overhead fibre services.
  26. Control manual and assisted handling of materials.
    ST0651 Control manual and assisted handling of materials.
  27. Coordinate analogue and digital information
    ST0741 Coordinate analogue and digital information
  28. Correct depth over fixings and adequate tension
    ST0821, ST0821 Correct depth over fixings and adequate tension
  29. Create Health & Safety documentation such as Risk Assessments and Method Statements (RAMS)
    ST0629 Create Health & Safety documentation such as Risk Assessments and Method Statements (RAMS)
  30. Create Operation and Maintenance documentation
    ST0629 Create Operation and Maintenance documentation
  31. Create plans illustrating land ownership, and accompanying schedules detailing any party with an interest in the land, as found from the land referencing tasks.
    ST0877 Create plans illustrating land ownership, and accompanying schedules detailing any party with an interest in the land, as found from the land referencing tasks.
  32. Create wiring schedule and power loadings for panel manufacture
    ST0629 Create wiring schedule and power loadings for panel manufacture
  33. Create, fit and assemble components to manufacture doors, windows with opening lights, units and/or fitments and staircases
    ST0264 Create, fit and assemble components to manufacture doors, windows with opening lights, units and/or fitments and staircases
  34. Cut, fix and install metal framed partitions, wall linings and openings.Cut and fix plasterboard mechanically and by direct bond in accordance with drawings and specifications.
    ST0096 Cut, fix and install metal framed partitions, wall linings and openings.Cut and fix plasterboard mechanically and by direct bond in accordance with drawings and specifications.
  35. Deal with injuries appropriate to their severity
    ST0414 Deal with injuries appropriate to their severity
  36. Deliver front-of-house services
    ST0617 Deliver front-of-house services
  37. Deliver work to the manufacturer's and customer's quality specifications.
    ST0442 Deliver work to the manufacturer's and customer's quality specifications.
  38. Delivered in line with cost.
    ST0670 Delivered in line with cost.
  39. Delivered in line with customer expectation and employer codes of conduct.
    ST0670 Delivered in line with customer expectation and employer codes of conduct.
  40. Delivered in line with customer expectations.
    ST0670 Delivered in line with customer expectations.
  41. Delivered in line with the specification.
    ST0670 Delivered in line with the specification.
  42. Delivered in line with timescale.
    ST0670 Delivered in line with timescale.
  43. Demonstrate the product and hand over installation paperwork to residential and commercial customers
    ST0743 Demonstrate the product and hand over installation paperwork to residential and commercial customers
  44. Demonstrate the product and handover installation paperwork to customer.
    ST0265 Demonstrate the product and handover installation paperwork to customer.
  45. Describe and code plans, planning documents, and supporting material accurately within a relevant workplace document filing system or casework management system
    ST0936 Describe and code plans, planning documents, and supporting material accurately within a relevant workplace document filing system or casework management system
  46. Design and create BEMS Technical Documentation
    ST0629 Design and create BEMS Technical Documentation
  47. Design and create client approved user interface for plant and systems with appropriate reference to integration issues
    ST0629 Design and create client approved user interface for plant and systems with appropriate reference to integration issues
  48. Design and write software for control systems to an industry approved standard
    ST0629 Design and write software for control systems to an industry approved standard
  49. Develop and maintain good occupational working relationships in the workplace.
    ST0750 Develop and maintain good occupational working relationships in the workplace.
  50. Dismantle the building e.g. removing connections to utilities, removing staircases, removing linkways following the supplied lift plan to move the building onto transport.
    ST0265 Dismantle the building e.g. removing connections to utilities, removing staircases, removing linkways following the supplied lift plan to move the building onto transport.
© 2023 Intelartes Ltd
An error has occurred. This application may no longer respond until reloaded. Reload 🗙