• Home
  • Definition
  • Browse competence definitions
  • Search definitions by domain, dimension or keywords and view their places in the generalisation hierarchy.
  1. Display the relevant hazard warning signs.
    ST0670, ST0670 Display the relevant hazard warning signs.
  2. Engage with a range of stakeholders involved in the project, including the communities affected by it.
    ST0877 Engage with a range of stakeholders involved in the project, including the communities affected by it.
  3. Ensure all access platforms are used where necessary and that all relevant health and safety and legal requirements have been met when storing and using paints and adhesives whilst also maintaining all tools and equipment
    ST0414 Ensure all access platforms are used where necessary and that all relevant health and safety and legal requirements have been met when storing and using paints and adhesives whilst also maintaining all tools and equipment
  4. Ensure all tasks meet the requirements laid down in any instructions/plans and that tasks meet any budgets set
    ST0414 Ensure all tasks meet the requirements laid down in any instructions/plans and that tasks meet any budgets set
  5. Ensure all testing of installations installed and maintenance is carried out in a safe manner and that all relevant health and safety and legal requirements have been met
    ST0414 Ensure all testing of installations installed and maintenance is carried out in a safe manner and that all relevant health and safety and legal requirements have been met
  6. Ensure compliance with British Standards BS (Lightning Protection) and BS (Earthing) is maintained at all times.
    ST0651 Ensure compliance with British Standards BS (Lightning Protection) and BS (Earthing) is maintained at all times.
  7. Ensure compliance with equality, diversity & inclusion (EDI) and ethical standards
    ST0091 Ensure compliance with equality, diversity & inclusion (EDI) and ethical standards
  8. Ensure compliance with health, safety & welfare requirements, apply safe systems of work, such as Common Safety Methods (CSM), and identify hazards and mitigate risks in their own work
    ST0091 Ensure compliance with health, safety & welfare requirements, apply safe systems of work, such as Common Safety Methods (CSM), and identify hazards and mitigate risks in their own work
  9. Ensure legal requirements are met when using plant, carry out all necessary paperwork and ensure that all safety precautions are taken and correct Personal Protective Equipment is worn
    ST0414 Ensure legal requirements are met when using plant, carry out all necessary paperwork and ensure that all safety precautions are taken and correct Personal Protective Equipment is worn
  10. Ensure structural stability using structural supports e.g. acrows or strong boys. Ensuring that the lintel is present and remains undamaged or that a new one is installed above the window
    ST0743 Ensure structural stability using structural supports e.g. acrows or strong boys. Ensuring that the lintel is present and remains undamaged or that a new one is installed above the window
  11. Ensure the correct Personal Protective Equipment is readily available prior to attending site.
    ST0670 Ensure the correct Personal Protective Equipment is readily available prior to attending site.
  12. Ensure work is carried out in line with industry standards - PCA Codes of Practice (Damp-proofing Barriers - Tanking in Association with Chemical Damp-proofing courses) and Guidance documents.
    ST0670 Ensure work is carried out in line with industry standards - PCA Codes of Practice (Damp-proofing Barriers - Tanking in Association with Chemical Damp-proofing courses) and Guidance documents.
  13. Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Code of Practice for the Investigation and Control of Wood Destroying Insects and Fungi in Buildings, Fungal Decay in Buildings).
    ST0670 Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Code of Practice for the Investigation and Control of Wood Destroying Insects and Fungi in Buildings, Fungal Decay in Buildings).
  14. Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Code of Practice for the Investigation and Control of Wood Destroying Insects and Fungi in Buildings, Wood Destroying Insects in Buildings).
    ST0670 Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Code of Practice for the Investigation and Control of Wood Destroying Insects and Fungi in Buildings, Wood Destroying Insects in Buildings).
  15. Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Guidance Note on the Party Wall Act).
    ST0670 Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Guidance Note on the Party Wall Act).
  16. Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Hygroscopic Salts and Rising Dampness; Plastering in Association with Damp-Proof Coursing; Chemical Damp-Proof Course Insertion - the attendant problems;Guidance Note Party Wall ; Code of Practice for the Investigation and Control of Dampness in Buildings).
    ST0670 Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents (Hygroscopic Salts and Rising Dampness; Plastering in Association with Damp-Proof Coursing; Chemical Damp-Proof Course Insertion - the attendant problems;Guidance Note Party Wall ; Code of Practice for the Investigation and Control of Dampness in Buildings).
  17. Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents.
    ST0670 Ensure work is carried out in line with industry standards - PCA Codes of Practice and Guidance documents.
  18. Ensure work is carried out in line with industry standards and relevant legislation and procedures.
    ST0670 Ensure work is carried out in line with industry standards and relevant legislation and procedures.
  19. Erect components such as modular units, panelised elements and secondary structures e.g.: support systems and balconies, bracketry, columns, lintels, external and internal fire stopping, service connections, internal fabric finishing materials according to specifications and drawings.
    ST0265 Erect components such as modular units, panelised elements and secondary structures e.g.: support systems and balconies, bracketry, columns, lintels, external and internal fire stopping, service connections, internal fabric finishing materials according to specifications and drawings.
  20. Erect components such as panels, large format block work, staircases, columns, flooring, lintels and pods according to specifications and drawings.
    ST0265 Erect components such as panels, large format block work, staircases, columns, flooring, lintels and pods according to specifications and drawings.
  21. Erect inclined roofs with gables, joists, roof coverings and roof components.
    ST0264 Erect inclined roofs with gables, joists, roof coverings and roof components.
  22. Erect inclined roofs with gables, roof verges and eaves, including finishings, joists and roof coverings, dormers and features.
    ST0263 Erect inclined roofs with gables, roof verges and eaves, including finishings, joists and roof coverings, dormers and features.
  23. Erect timber frame panels to create walls on-site according to specifications and drawings.
    ST0265 Erect timber frame panels to create walls on-site according to specifications and drawings.
  24. Erect timber roof structures and components, in-situ roofs and pre-assembled roof structures according to drawings and specifications.
    ST0265 Erect timber roof structures and components, in-situ roofs and pre-assembled roof structures according to drawings and specifications.
  25. Establish daily and weekly tasks and organise own work with emphasis on efficiency and safety.
    ST0821 Establish daily and weekly tasks and organise own work with emphasis on efficiency and safety.
  26. Establish systems and equipment to create a safe working environment in line with organisational procedures, site requirements and budgets.
    ST0651 Establish systems and equipment to create a safe working environment in line with organisational procedures, site requirements and budgets.
  27. Establish the suitability of the work area including PPE equipment, scaffolding, ladders and an understanding of how any risk assessment affects them.
    ST0821 Establish the suitability of the work area including PPE equipment, scaffolding, ladders and an understanding of how any risk assessment affects them.
  28. Evaluate and manage the needs of people, place and nature
    ST0742 Evaluate and manage the needs of people, place and nature
  29. Evaluate condition of roof and prepare roof for thatching
    ST0821 Evaluate condition of roof and prepare roof for thatching
  30. Evaluate, assess and advise on environmental impact and opportunities for regeneration, flood management, sustainable transport and protection of historical sites and the natural environment
    ST0742 Evaluate, assess and advise on environmental impact and opportunities for regeneration, flood management, sustainable transport and protection of historical sites and the natural environment
  31. Extract and use information from the machine's operator's manual, site plans and drawings and verbal communication
    ST0736 Extract and use information from the machine's operator's manual, site plans and drawings and verbal communication
  32. Finish plasterboard surfaces by tape and joint or finishing plasters.
    ST0096 Finish plasterboard surfaces by tape and joint or finishing plasters.
  33. Fit doors, doorsets, and ironmongery, fix trims/mouldings, form junctions
    ST0388 Fit doors, doorsets, and ironmongery, fix trims/mouldings, form junctions
  34. Fit integral glass, frames, trims and mouldings, install glass panels and blinds
    ST0388 Fit integral glass, frames, trims and mouldings, install glass panels and blinds
  35. Fix appropriate thatching materials to roof features with correct depth over fixings and adequate tensions.
    ST0821 Fix appropriate thatching materials to roof features with correct depth over fixings and adequate tensions.
  36. Fix fenestration units in place, making sure they are plumb, level and secure using a range of tools and technologies e.g. spirit level, laser level, through frame fixings, one way screws, Thread cutting screws or machine screws if working with aluminium. Follow guidance and manufacturers requirements or systems manuals
    ST0743 Fix fenestration units in place, making sure they are plumb, level and secure using a range of tools and technologies e.g. spirit level, laser level, through frame fixings, one way screws, Thread cutting screws or machine screws if working with aluminium. Follow guidance and manufacturers requirements or systems manuals
  37. Fixing appropriate thatching materials to basic roof structure with correct depth over fixings and adequate tension.
    ST0821 Fixing appropriate thatching materials to basic roof structure with correct depth over fixings and adequate tension.
  38. Fixing temporary works for stability and safe access
    ST0265 Fixing temporary works for stability and safe access
  39. Follow connection details and ensure it has been installed according to specification
    ST0265 Follow connection details and ensure it has been installed according to specification
  40. Follow due diligence in providing advice to clients
    ST0331 Follow due diligence in providing advice to clients
  41. Follow instructions and take responsibility for minimising risk and ensuring own safety and the safety of the team
    ST0669 Follow instructions and take responsibility for minimising risk and ensuring own safety and the safety of the team
  42. Follow instructions to minimise risk and ensure the safety of the team and customer
    ST0670 Follow instructions to minimise risk and ensure the safety of the team and customer
  43. Follow manufacturer's instructions to correctly assemble systems from component parts
    ST0614 Follow manufacturer's instructions to correctly assemble systems from component parts
  44. Follow organisational procedures to prepare the exterior building to meet customer specifications e.g. shot blasting, repainting the exterior, windows, stairways, linkways, doors, ironmongery, trims.
    ST0265 Follow organisational procedures to prepare the exterior building to meet customer specifications e.g. shot blasting, repainting the exterior, windows, stairways, linkways, doors, ironmongery, trims.
  45. Follow up enquiries via phone/site visit, encouraging parties to sign access licences and respond to any concerns they may have.
    ST0877 Follow up enquiries via phone/site visit, encouraging parties to sign access licences and respond to any concerns they may have.
  46. For external rendering fix and form stops/expansion joints and bell casts to form drips for weathering
    ST0096 For external rendering fix and form stops/expansion joints and bell casts to form drips for weathering
  47. For internal plastering cut and fix a range of standard and thin coat beads/trims to form true surfaces such as corners/returns for openings,
    ST0096 For internal plastering cut and fix a range of standard and thin coat beads/trims to form true surfaces such as corners/returns for openings,
  48. Form builders works holes and openings for windows and doors
    ST0388 Form builders works holes and openings for windows and doors
  49. Form framed and frameless beam and column in accordance with specification & manufactures instructions
    ST0388 Form framed and frameless beam and column in accordance with specification & manufactures instructions
  50. Form junctions, abutments and angles according to specification & manufactures instructions
    ST0388 Form junctions, abutments and angles according to specification & manufactures instructions
© 2023 Intelartes Ltd
An error has occurred. This application may no longer respond until reloaded. Reload 🗙