• Home
  • Definition
  • Browse competence definitions
  • Search definitions by domain, dimension or keywords and view their places in the generalisation hierarchy.
  1. Formulate strategies, detailing and specifications for landscapes
    ST0742 Formulate strategies, detailing and specifications for landscapes
  2. Gather FM-related information for continuous improvement purposes
    ST0617 Gather FM-related information for continuous improvement purposes
  3. Identify and confirm carpentry or joinery requirements and components against specification/drawings/CAD/BIM and in accordance with Building Regulations
    ST0264 Identify and confirm carpentry or joinery requirements and components against specification/drawings/CAD/BIM and in accordance with Building Regulations
  4. Identify and confirm fenestration installation requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations such as Approved Documents Parts A-J, K-N, P, Q and Regulation 7
    ST0743 Identify and confirm fenestration installation requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations such as Approved Documents Parts A-J, K-N, P, Q and Regulation 7
  5. Identify and confirm installation requirements for pre-assembled (e.g. Columns or beams) and manufactured elements and components (e.g. cut or bent reinforcement bars) against specification/drawings/construction information.
    ST0271 Identify and confirm installation requirements for pre-assembled (e.g. Columns or beams) and manufactured elements and components (e.g. cut or bent reinforcement bars) against specification/drawings/construction information.
  6. Identify and confirm masonry requirements against surveys, job sheets, specifications and drawings/CAD, and in accordance with Building Regulations.
    ST0442 Identify and confirm masonry requirements against surveys, job sheets, specifications and drawings/CAD, and in accordance with Building Regulations.
  7. Identify and confirm plastering requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations.
    ST0096 Identify and confirm plastering requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations.
  8. Identify and inspect Fall protection equipment for own use and commissioning purposes
    ST0614 Identify and inspect Fall protection equipment for own use and commissioning purposes
  9. Identify and respond to customer needs
    ST0295 Identify and respond to customer needs
  10. Identify and select appropriate plastering materials, modern pre-blended and loose plasters, renders and additives including compounds, fixings, performance plasterboards, reinforcements and beads to carry out the plastering work in line with specifications and manufactures instructions.
    ST0096 Identify and select appropriate plastering materials, modern pre-blended and loose plasters, renders and additives including compounds, fixings, performance plasterboards, reinforcements and beads to carry out the plastering work in line with specifications and manufactures instructions.
  11. Identify and use the appropriate calibrated digital testing equipment for copper or fibre products
    ST0832 Identify and use the appropriate calibrated digital testing equipment for copper or fibre products
  12. Identify different types of building construction and terminology
    ST0670 Identify different types of building construction and terminology
  13. Identify different types of building construction and terminology, including timber roof construction, pitched roof coverings, foundation types, load bearing wall construction, timber frame constructed buildings, etc.
    ST0670 Identify different types of building construction and terminology, including timber roof construction, pitched roof coverings, foundation types, load bearing wall construction, timber frame constructed buildings, etc.
  14. Identify faults and ensure plant is maintained to the correct standard, ensuring all procedures have been met when plant is prepared for road travel
    ST0414 Identify faults and ensure plant is maintained to the correct standard, ensuring all procedures have been met when plant is prepared for road travel
  15. Identify requirements, develop the work programme and schedule, plan their own work and that of the team accordingly, ensuring this is communicated clearly to colleagues.
    ST0263 Identify requirements, develop the work programme and schedule, plan their own work and that of the team accordingly, ensuring this is communicated clearly to colleagues.
  16. Identify, deal with and report issues and problems
    ST0669 Identify, deal with and report issues and problems
  17. Identifying mould growth associated with condensation.
    ST0670 Identifying mould growth associated with condensation.
  18. Implement administrative procedures for the running of a construction project
    ST0331 Implement administrative procedures for the running of a construction project
  19. Implement necessary pedestrian controls and traffic management.
    ST0651 Implement necessary pedestrian controls and traffic management.
  20. Inspect the site for relevant access and power to allow the installation to start
    ST0802 Inspect the site for relevant access and power to allow the installation to start
  21. Install a damp proof membrane
    ST0670 Install a damp proof membrane
  22. Install a down conductor network either by the use of conductor tape or by the use of a building structure, testing and verifying acceptability.
    ST0651 Install a down conductor network either by the use of conductor tape or by the use of a building structure, testing and verifying acceptability.
  23. Install a range of cast mouldings according to drawings and customer requirements e.g. arches and columns
    ST0096 Install a range of cast mouldings according to drawings and customer requirements e.g. arches and columns
  24. Install accessible service encasements, bespoke wall/ floor units and fitments, panelling and stair components (e.g. balustrades, handrails and spindles to staircases with turns).
    ST0263 Install accessible service encasements, bespoke wall/ floor units and fitments, panelling and stair components (e.g. balustrades, handrails and spindles to staircases with turns).
  25. Install air termination rods and isolated masts.
    ST0651 Install air termination rods and isolated masts.
  26. Install an air termination network, jointing of conductors and bonding of extraneous metalwork.
    ST0651 Install an air termination network, jointing of conductors and bonding of extraneous metalwork.
  27. Install ancillary items e.g. air tightness measures, damp-proofing, membranes, fire stops, cavity barriers according to drawings and specifications.
    ST0265 Install ancillary items e.g. air tightness measures, damp-proofing, membranes, fire stops, cavity barriers according to drawings and specifications.
  28. Install and commission fall protection equipment - in the field working independantly
    ST0614 Install and commission fall protection equipment - in the field working independantly
  29. Install and lay cassette floor decks and/or install floor joists according to specifications and drawings.
    ST0265 Install and lay cassette floor decks and/or install floor joists according to specifications and drawings.
  30. Install and relocate modular demountable partition systems in accordance with manufacturers guidelines and specification
    ST0388 Install and relocate modular demountable partition systems in accordance with manufacturers guidelines and specification
  31. Install and repair Framed wall linings Eg metal dryliner channels, metal wall furrings, timber battens
    ST0388 Install and repair Framed wall linings Eg metal dryliner channels, metal wall furrings, timber battens
  32. Install and repair metal stud partitions according to/in accordance with design details, specification, manufactures recommendations and best practice guidelines
    ST0388 Install and repair metal stud partitions according to/in accordance with design details, specification, manufactures recommendations and best practice guidelines
  33. Install BEMS control equipment and wiring systems
    ST0629 Install BEMS control equipment and wiring systems
  34. Install building components including door and window frames, door and hatch linings, floor joists and coverings, straight partitions and straight staircases.
    ST0264 Install building components including door and window frames, door and hatch linings, floor joists and coverings, straight partitions and straight staircases.
  35. Install cast mouldings according to specifications and customer requirements.
    ST0096 Install cast mouldings according to specifications and customer requirements.
  36. install complex and non-standard doors and window frames, shaped door and hatch linings, partitions with openings and changes of direction and staircases with turns.
    ST0263 install complex and non-standard doors and window frames, shaped door and hatch linings, partitions with openings and changes of direction and staircases with turns.
  37. Install doors, mouldings, ironmongery, service encasements, wall and floor units and fitments, cladding and staircase components.
    ST0264 Install doors, mouldings, ironmongery, service encasements, wall and floor units and fitments, cladding and staircase components.
  38. Install glass units, infill panels and hardware into the fenestration framework e.g. bi-folds, conservatory roofs, decorative and specialist glazing products
    ST0743 Install glass units, infill panels and hardware into the fenestration framework e.g. bi-folds, conservatory roofs, decorative and specialist glazing products
  39. Install grid work including mullions and transoms on vertical applications, purlins and rafters on sloped applications. Fix the grid work to the structure in accordance with specifications and approved drawings making allowance for dissimilar materials and fire stops if required. Follow the system suppliers recommendations and CWCT guidelines
    ST0802 Install grid work including mullions and transoms on vertical applications, purlins and rafters on sloped applications. Fix the grid work to the structure in accordance with specifications and approved drawings making allowance for dissimilar materials and fire stops if required. Follow the system suppliers recommendations and CWCT guidelines
  40. Install infill materials and products using temporary pressure plate (Stitch plates) according to the systems manual and CWCT guidelines
    ST0802 Install infill materials and products using temporary pressure plate (Stitch plates) according to the systems manual and CWCT guidelines
  41. Install internal stonework and stone flooring.
    ST0442 Install internal stonework and stone flooring.
  42. Install metal furring ceilings and bulkheads in accordance with specification & manufactures instructions
    ST0388 Install metal furring ceilings and bulkheads in accordance with specification & manufactures instructions
  43. Install plasterboard partitions in accordance with specification & manufactures instructions
    ST0388 Install plasterboard partitions in accordance with specification & manufactures instructions
  44. Install plywood pattresses according to specification & manufactures instructions
    ST0388 Install plywood pattresses according to specification & manufactures instructions
  45. Install propping and other temporary works such as edge protection as per specifications and drawings.
    ST0265 Install propping and other temporary works such as edge protection as per specifications and drawings.
  46. Install reinforced concrete (such as tram stops, retaining walls, platforms, ducting and drainage)
    ST0669 Install reinforced concrete (such as tram stops, retaining walls, platforms, ducting and drainage)
  47. Install structural fixings and compete required commissioning regimes.
    ST0614 Install structural fixings and compete required commissioning regimes.
  48. Install suspended ceiling systems egProprietary suspended ceilings and carry out repairsConcealed and exposed mineral and/or metal grid ceilingsMetal and/or mineral plank ceilingsRafts and/or acoustic baffle sections
    ST0388 Install suspended ceiling systems egProprietary suspended ceilings and carry out repairsConcealed and exposed mineral and/or metal grid ceilingsMetal and/or mineral plank ceilingsRafts and/or acoustic baffle sections
  49. Install temporary works for transportation such as bracing, temporary seals and covers.
    ST0265 Install temporary works for transportation such as bracing, temporary seals and covers.
  50. Install/erect/repair masonry components and finish as required.
    ST0442 Install/erect/repair masonry components and finish as required.
© 2023 Intelartes Ltd
An error has occurred. This application may no longer respond until reloaded. Reload 🗙