ST0264
Calculate the most efficient quantity, length and area of resources.
-
ST0265
Carry out after hire inspections and report findings once the building is returned to the depot in order to prepare invoice for damages.
-
ST0414
Carry out all combat engineering tasks safely and with due consideration for others, using necessary protective equipment and guiding unloading tasks
-
ST0629
Carry out and produce detailed conditional site survey reports along with remedial/ enhancement recommendations
-
ST0859
Carry out and record CPD necessary to maintain and enhance competence in own area of practice
-
ST0414
Carry out basic fault identification on the engine, the electrical system, the fuel system, the cooling system and the hydraulic system
-
ST0736
Carry out checks, make adjustments and alterations to the machine and preparing the machines for work
-
ST0670
Carry out Death Watch Beetle treatment
-
ST0265
Carry out dimensional checks of the slab and mark up positions e.g. starter bars and rails according to specifications and drawings.
-
ST0265
Carry out dimensional checks of the slab and mark up positions, e.g.: grid, anchorages, ground cleats, services and drainage, according to specifications and drawings.
-
ST0670
Carry out Dry Rot (Serpula lacrymans) treatment
-
ST0629
Carry out fault finding and rectification of defective control equipment or software algorithms
-
ST0265
Carry out finishing works and installation of the ancillary items such as window formers, cavity trays and insulation products.
-
ST0265
Carry out internal finishing works and installation of the ancillary items such as bay joints, service connections and completions, suspended ceilings, flooring, thresholds, internal fabric items, cavity trays, insulation products and decorative finishes.
-
ST0651
Carry out maintenance and inspection duties, including fault finding and rectification.
-
ST0265
Carry out maintenance to buildings in accordance with the planned schedule or in reaction to customer feedback e.g. broken component, different layout required.
-
ST0670
Carry out necessary building repairs (treatment for lateral water penetration)
-
ST0670
Carry out necessary building repairs, including repair and renew floorboards, repair and renew joist ends, repair a timber stud partition, replace a decayed timber lintel, install a sub floor vent, infill small voids, correct way to dispose of waste.
-
ST0736
Carry out operator-level servicing and maintenance activities using relevant information sources
-
ST0265
Carry out pre-use checks of all lifting and handling equipment to be used for the project
-
ST0263
Carry out pre-use checks of all tools and equipment to be used for the project by self and colleagues, providing training and instruction where necessary.
-
ST0271, ST0265
Carry out quality checks against specification and take remedial action where instructed
-
ST0264
Carry out quality checks against specification and take remedial action where required or instructed
-
ST0263
Carry out quality checks of own and others work against specification and take remedial action, providing instructions to others as to the work required.
-
ST0669
Carry out site clearance activities and ensure all equipment is secure and safe
-
ST0750
Carry out site measurements and evaluations in the workplace.
-
ST0265
Carry out structural connections using items such as inter-modular bracketry, tie cleats, core cleat connections, ground anchors, grout and specialist fixings as per specifications and drawings.
-
ST0265
Carry out structural connections using items such as, rebar, strand, grout and specialist fixings as per specifications and drawings.
-
ST0629
Carry out the electrical testing and inspection of BEMS related controls equipment
-
ST0670
Carry out treatment for condensation
-
ST0670
Carry out treatment for the control of rising damp
-
ST0802
Carry out visual checks on delivered materials for quality, complete delivery, and correct fabrication and machining
-
ST0670
Carry out Wet Rot treatment
-
ST0670
Carry out wood boring insect treatment
-
ST0750
Carry out workplace risk assessments.
-
ST0096
Cast mouldings from a range of materials including fibrous plaster, GRG and GRC (glass fibre reinforced cement)
-
ST0265
Check work area is safe at all times and in line with method statements and risk assessments
-
ST0802
Clean and handover to customer including main contractors, clients, architects, fabrication specialists, fa&#;ade specialist
-
ST0442
Clean facade surfaces.
-
ST0743
Clear away leftover materials on completion of installation and disposal of waste appropriately according to the appropriate code of practice
-
ST0096
Clear away leftover materials on completion of project and disposal of waste appropriately according to the appropriate code of practice.
-
ST0442
Clear away leftover materials on completion of work and dispose of waste appropriately according to the appropriate code of practice.
-
ST0629
Commission BEMS software and controls equipment
-
ST0091
Communicate and liaise effectively with own project team, customers, internal or external stakeholders
-
ST0414
Communicate clearly at all levels ensuring the message has been understood
-
ST0859
Communicate complex subjects to technical and non- technical people
-
ST0832
Communicate effectively with the end user, listening and understanding issues to faults or service, demonstrating the working service providing clear explanations as to how to get the best performance from their products.
-
ST0263, ST0096
Communicate professionally with colleagues, customers and stakeholders, providing a high level of customer service at all times.
-
ST0802
Complete any relevant documentation such as; sign off documents and/or handover documents for main contractors, site/product specific check lists, time sheets for additional works, and operation and maintenance manuals.
-
ST0271, ST0265
Complete documentation related to the project e.g. timesheet, delivery notes, method statements