-
ST0742
Formulate strategies, detailing and specifications for landscapes
-
ST0617
Gather FM-related information for continuous improvement purposes
-
ST0264
Identify and confirm carpentry or joinery requirements and components against specification/drawings/CAD/BIM and in accordance with Building Regulations
-
ST0743
Identify and confirm fenestration installation requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations such as Approved Documents Parts A-J, K-N, P, Q and Regulation 7
-
ST0271
Identify and confirm installation requirements for pre-assembled (e.g. Columns or beams) and manufactured elements and components (e.g. cut or bent reinforcement bars) against specification/drawings/construction information.
-
ST0442
Identify and confirm masonry requirements against surveys, job sheets, specifications and drawings/CAD, and in accordance with Building Regulations.
-
ST0096
Identify and confirm plastering requirements and components against a survey/job sheet/specification/drawings/CAD/BIM and in accordance with Building Regulations.
-
ST0614
Identify and inspect Fall protection equipment for own use and commissioning purposes
-
ST0295
Identify and respond to customer needs
-
ST0096
Identify and select appropriate plastering materials, modern pre-blended and loose plasters, renders and additives including compounds, fixings, performance plasterboards, reinforcements and beads to carry out the plastering work in line with specifications and manufactures instructions.
-
ST0832
Identify and use the appropriate calibrated digital testing equipment for copper or fibre products
-
ST0670
Identify different types of building construction and terminology
-
ST0670
Identify different types of building construction and terminology, including timber roof construction, pitched roof coverings, foundation types, load bearing wall construction, timber frame constructed buildings, etc.
-
ST0414
Identify faults and ensure plant is maintained to the correct standard, ensuring all procedures have been met when plant is prepared for road travel
-
ST0263
Identify requirements, develop the work programme and schedule, plan their own work and that of the team accordingly, ensuring this is communicated clearly to colleagues.
-
ST0669
Identify, deal with and report issues and problems
-
ST0670
Identifying mould growth associated with condensation.
-
ST0331
Implement administrative procedures for the running of a construction project
-
ST0651
Implement necessary pedestrian controls and traffic management.
-
ST0802
Inspect the site for relevant access and power to allow the installation to start
-
ST0670
Install a damp proof membrane
-
ST0651
Install a down conductor network either by the use of conductor tape or by the use of a building structure, testing and verifying acceptability.
-
ST0096
Install a range of cast mouldings according to drawings and customer requirements e.g. arches and columns
-
ST0263
Install accessible service encasements, bespoke wall/ floor units and fitments, panelling and stair components (e.g. balustrades, handrails and spindles to staircases with turns).
-
ST0651
Install air termination rods and isolated masts.
-
ST0651
Install an air termination network, jointing of conductors and bonding of extraneous metalwork.
-
ST0265
Install ancillary items e.g. air tightness measures, damp-proofing, membranes, fire stops, cavity barriers according to drawings and specifications.
-
ST0614
Install and commission fall protection equipment - in the field working independantly
-
ST0265
Install and lay cassette floor decks and/or install floor joists according to specifications and drawings.
-
ST0388
Install and relocate modular demountable partition systems in accordance with manufacturers guidelines and specification
-
ST0388
Install and repair Framed wall linings Eg metal dryliner channels, metal wall furrings, timber battens
-
ST0388
Install and repair metal stud partitions according to/in accordance with design details, specification, manufactures recommendations and best practice guidelines
-
ST0629
Install BEMS control equipment and wiring systems
-
ST0264
Install building components including door and window frames, door and hatch linings, floor joists and coverings, straight partitions and straight staircases.
-
ST0096
Install cast mouldings according to specifications and customer requirements.
-
ST0263
install complex and non-standard doors and window frames, shaped door and hatch linings, partitions with openings and changes of direction and staircases with turns.
-
ST0264
Install doors, mouldings, ironmongery, service encasements, wall and floor units and fitments, cladding and staircase components.
-
ST0743
Install glass units, infill panels and hardware into the fenestration framework e.g. bi-folds, conservatory roofs, decorative and specialist glazing products
-
ST0802
Install grid work including mullions and transoms on vertical applications, purlins and rafters on sloped applications. Fix the grid work to the structure in accordance with specifications and approved drawings making allowance for dissimilar materials and fire stops if required. Follow the system suppliers recommendations and CWCT guidelines
-
ST0802
Install infill materials and products using temporary pressure plate (Stitch plates) according to the systems manual and CWCT guidelines
-
ST0442
Install internal stonework and stone flooring.
-
ST0388
Install metal furring ceilings and bulkheads in accordance with specification & manufactures instructions
-
ST0388
Install plasterboard partitions in accordance with specification & manufactures instructions
-
ST0388
Install plywood pattresses according to specification & manufactures instructions
-
ST0265
Install propping and other temporary works such as edge protection as per specifications and drawings.
-
ST0669
Install reinforced concrete (such as tram stops, retaining walls, platforms, ducting and drainage)
-
ST0614
Install structural fixings and compete required commissioning regimes.
-
ST0388
Install suspended ceiling systems egProprietary suspended ceilings and carry out repairsConcealed and exposed mineral and/or metal grid ceilingsMetal and/or mineral plank ceilingsRafts and/or acoustic baffle sections
-
ST0265
Install temporary works for transportation such as bracing, temporary seals and covers.
-
ST0442
Install/erect/repair masonry components and finish as required.