-
ST0669
Provide assistance to customers and members of the public
-
ST0736
Provide assistance when a machine is to be loaded onto and unloaded from an HGV/low loader truck and assist in securing for transport
-
ST0936
Provide clear and relevant advice to members of the public, councillors, agents and/or clients on planning issues, face to face, by phone and by email and other communications.
-
ST0617
Provide customer service to internal and external customers to ensure the effective delivery of a range of facilities services
-
ST0442
Provide details and finishing to memorial stones.
-
ST0742
Provide leadership for the management of protected landscapes including, but not limited to, heritage landscapes, Areas of Outstanding Natural Beauty and National Parks. Develop and manage relationships including with friends groups, the public, local communities, volunteers and staff.
-
ST0742
Provide leadership for the preparation or determination of statutory planning applications, plans or proposals
-
ST0742
Provide leadership in the promotion of the sensitive and sustainable development and use of landscapes, places and infrastructure to a wide range of stakeholders
-
ST0331
Provide professional advice and recommendations to clients relating to land, property or construction
-
ST0742
Provide professional advice on environmental, legal and regulatory issues relating to landscapes
-
ST0741
Provide support for other landscape professionals
-
ST0832
Providing and installing infrastructure to upgrade mobile services supplying masts G and future roll out G networks.
-
ST0832
Provision of new telecom services in business and residential properties such as phone, a range of broadband products, TV connections, private circuits and business systems or services.
-
ST0821
Quantifying thatching work and materials with the ability to work out how much material and time is required to complete a thatching job efficiently and safely.
-
ST0614
Read and interpret engineering drawings, specifications & quantities
-
ST0265
Read, interpret and work to drawings, specifications and construction information e.g. lifting plan, logistics plan, manufacturers information
-
ST0802
Receive, unload, check, safely store and transport materials to site for installation following good handling practices preventing injury or damage
-
ST0271
Receive, unload, move and lift materials to site for installation following good handling practices preventing injury or damage.
-
ST0388
Recycle waste to contribute to zero/low carbon outcomes in the built environment
-
ST0743
Remove existing fenestration, understanding what action should be taken or who to report situations to if unexpected or dangerous materials are exposed e.g. asbestos, cavity barriers, damaged DPC or birds nests
-
ST0442
Remove, install and repair basic external stonemasonry structures and stone cladding.
-
ST0750
Repair and maintain Mastic Asphalt coverings in the workplace.
-
ST0263
Repair and or replace frames, mouldings, floor or flat roof joist coverings, door and window ironmongery, window components, structural joists and rafters, window components, guttering and downpipes
-
ST0096
Repair existing plasterwork, making good, restoring it to its original state.
-
ST0936
Research and compile site history including any land use policy restrictions and constraints
-
ST0859
Research and critically evaluate complex fire engineering systems, products and processes
-
ST0096
Restore existing mouldings, considering different types, materials and appropriateness to building structure and age.
-
ST0629
Review completed control panel drawings to check, amend and approve
-
ST0936
Review environmental and other specialist designations and reports to provide a preliminary assessment of the environmental and physical impact of planning applications and/or development proposals.
-
ST0670
Review the specification of work, understand the type of work to be undertaken, check job lists, cutting lists, stock withdrawal, plant required and materials required.
-
ST0670
Review the specification of work, understand the type of work to be undertaken, check job lists, cutting lists, stock withdrawal, plant required and materials required.Install a chemical damp proof course using the correct materials and equipment, at the correct height, carrying out any necessary specialist replastering internally to height specified
-
ST0821
Safe loading, unloading and transporting of tools and materials, completed PPE checklist
-
ST0651
Safely install an earth network by the use of earth electrodes, earth mats or the use of building foundations including the identification and avoidance of buried services.
-
ST0614
Safely operate different types of access portable or temporary equipment
-
ST0802
Secure the infills in place using appropriate methods e.g. toggles and/or pressure plates to the correct torque setting according to systems manuals
-
ST0265
Select and use materials according to specification
-
ST0271
Select appropriate equipment and resources for the task and carry out pre-use checks to ensure it is fit for purpose.
-
ST0802
Select the appropriate tools and equipment for work including access equipment. Also ensure all hand tools and lifting equipment, where required, are inspected for satisfactory condition to be used
-
ST0263
Select the required quantity and quality of resources required for carrying out complex and non-standard work, including timber, tools and fixings.
-
ST0442
Select, use and maintain tools, components and equipment appropriate to the task being carried out.
-
ST0263
Set out complex work tasks for non-standard architectural joinery products, including complex door sets, doors, windows, units and fitments, staircases (straight and with turns) and products with single/double curvature features.
-
ST0802
Set out of curtain wall including obtaining relevant grid lines and datum levels from main contractor. System may require temporary fixings prior to being lined, levelled and plumbed and final fixing taking place.
-
ST0669
Set up and maintain a temporary traffic management system
-
ST0263
Set up and use fixed machinery such as circular saws, planers, thicknessers, bandsaws, morticers, tenoners, spindle moulders, grinders (including tool sharpening) and sanders.
-
ST0936
Summarise policy constraints, site research and baseline analysis with regards to planning applications or proposal for developments and present the information clearly and concisely in written and verbal format to Chartered Town Planners
-
ST0936
Support Chartered Town Planners to deliver projects including following a project plan and ensuring key timescales are met.
-
ST0617
Support good sustainable practice in FM
-
ST0617
Support hard FM functions
-
ST0617
Support the delivery of FM projects
-
ST0617
Support the delivery of the responsibilities of the Facilities Services function in complying with health and safety and other legislation and organizational policies and procedures